
Property Maintenance
PAT Testing — Portable Appliance Testing
Guardian Edge carries out in-service inspection and testing of electrical equipment across the UK. There is no law requiring 'PAT testing' by name — the Electricity at Work Regulations 1989 require electrical systems to be maintained to prevent danger, and testing at risk-based intervals is the recognised way to demonstrate that.
A duty to maintain, not a duty to test everything every year.
Who this is for
- Employers and workplace duty holders
- HMO and student accommodation landlords
- Facilities managers with equipment across multiple sites
- Letting agents providing appliances in furnished lets
Problems it solves
- Everything is being tested annually regardless of risk, at unnecessary cost
- Nothing has been tested at all and an insurer has asked
- There is no asset register so nobody knows what should be tested
- Failed items were labelled and then left in use
What Guardian Edge provides
Our pat testing scope
What we provide
- Formal visual inspection and combined inspection and testing
- Asset register creation with unique identifiers and location records
- Risk-based interval setting rather than blanket annual testing
- Clear reporting on pass, fail and remedial items
- Repair or replacement of failed equipment
Typical scope
- Offices, retail, hospitality, industrial and workshop environments
- HMOs, student accommodation and furnished lettings
- IT equipment, kitchen equipment, tools, extension leads and portable plant
Before we price anything
Inspection & survey process
- 01
Build the asset register
You cannot manage testing intervals without knowing what equipment exists and where it lives.
- 02
Set intervals by risk
A double-insulated desk lamp in an office is a different risk from a 110V site tool. The HSE explicitly supports a risk-based approach rather than universal annual testing.
On site
How the work is delivered
- 01
Inspect and test
Formal visual inspection first — most faults are found visually — followed by electrical testing where the risk warrants it.
- 02
Label and record
Each item labelled with its identifier and test date, and recorded in the register.
- 03
Deal with failures
Failed items are removed from service, not merely labelled. Repair or replacement is quoted with the report.
Compliance
What the rules actually require
- There is no statutory requirement to carry out 'PAT testing' as such. The requirement is in the Electricity at Work Regulations 1989: electrical systems must be maintained so far as reasonably practicable to prevent danger.
- The HSE's position is that the frequency and extent of inspection and testing should be determined by risk assessment, and that blanket annual testing of all equipment is often unnecessary.
- For landlords, the Electrical Safety Standards in the Private Rented Sector (England) Regulations 2020 do not require portable appliance testing, but the Landlord and Tenant Act and general safety duties mean appliances provided by the landlord should be safe.
- Anyone claiming that annual PAT testing of every item is a legal requirement is overstating the position. We will not.
Standards & legislation
These are not all the same kind of obligation, and we do not present them as if they were. A statutory duty is law. A British Standard is the recognised way of demonstrating you have met one. Guidance and our own recommendations are neither.
- Legal requirementElectricity at Work Regulations 1989
Duty to maintain electrical systems
The actual statutory duty. Inspection and testing is a means of complying, not the duty itself.
Read the primary source → - Official guidanceIET Code of Practice for In-service Inspection and Testing
Recognised methodology and interval guidance
The reference document for inspection procedures and suggested risk-based intervals.
Ongoing support
Planned, reactive and multi-site.
Most providers do one of these well. The value of a single provider is that the schedule, the emergency and the portfolio all sit in the same place.
Planned maintenance
- Testing programmes on risk-based intervals across the estate
- Register maintained as equipment is added and disposed of
Reactive support
- Testing for new equipment and after repair
- Rapid testing where an audit is imminent
Multi-site & national portfolios
- One register and one programme across every site
Procurement, simplified
What happens next?
- 01
Tell us what you need
One form, one call or one email. A photograph or an existing report is enough to start.
- 02
We assess the requirement
We confirm scope, access, and whether a site survey is needed before anything is priced.
- 03
You receive a clear quotation
Itemised, with what is included and what is not. No provisional sums that move later.
- 04
We arrange attendance
A confirmed date and window, with the engineer or trade named in advance.
- 05
Works are completed
Carried out by directly managed engineers or vetted specialist subcontractors.
- 06
Evidence is supplied
Certification, test records and photographic evidence where the work calls for it.
Answers
PAT Testingquestions.
Is PAT testing a legal requirement?
Related services
Other disciplines
Locations covered
- Aberdeen City
- Aberdeenshire
- Angus
- Antrim and Newtownabbey
- Ards and North Down
- Argyll and Bute
- Armagh City Banbridge and Craigavon
- Barnsley
- Bath and North East Somerset
- Bedford
- Blackburn with Darwen
- Blackpool
- Blaenau Gwent
- Borough of Bolton
- Borough of Bury
- Borough of Halton
- Borough of Oldham
- Borough of Rochdale
- Find coverage near you →
Get a quotation for pat testing.
One form, one call or one email. A photograph or an existing report is enough for us to start — and we will tell you plainly whether a site survey is needed before anything is priced.
