
Fire Protection
Fire Alarm Installation
Guardian Edge designs, installs and commissions fire detection and alarm systems to BS 5839 across the UK, from single-panel conventional systems in small premises to addressable and networked systems across multi-building sites — including takeovers of existing systems and replacement of obsolete panels.
Designed to the right category for the building — not the cheapest one.
Who this is for
- Businesses fitting out or refurbishing premises
- Landlords and managing agents of residential blocks and HMOs
- Property managers replacing an obsolete or unsupported panel
- Facilities teams extending detection into a new area
- Anyone whose fire risk assessment has identified inadequate detection
Problems it solves
- The existing panel is obsolete and parts are no longer available
- Detection does not cover the whole escape route
- The system was designed to a lower category than the current use warrants
- Repeated false alarms are eroding confidence in the system
- A change of use or layout has left the design no longer valid
- Building control or an insurer has asked for a system that does not exist yet
What Guardian Edge provides
Our fire alarm installations scope
What we provide
- System category assessment — establishing whether L1, L2, L3, L4, L5, P1 or P2 is appropriate
- Full design to BS 5839-1 (non-domestic) or BS 5839-6 (domestic premises)
- Conventional, addressable, networked and wireless systems
- Panel replacement and takeover of existing field devices where they remain suitable
- Cause-and-effect programming, interfaces to plant, door holders, lifts and AOVs
- Commissioning, certification, logbook and demonstration to your team
Typical scope
- Offices, retail, industrial units, warehouses and logistics sites
- Residential blocks, HMOs, student accommodation and supported housing
- Schools, healthcare premises and public buildings
- Multi-building estates requiring networked panels and a head-end
- Phased installation in occupied buildings, out of hours where required
Before we price anything
Inspection & survey process
- 01
Establish the fire strategy
Occupancy, sleeping risk, escape routes, phased or simultaneous evacuation, and any existing fire risk assessment.
- 02
Agree the category
L-categories protect life, P-categories protect property. We explain what each level actually covers before you commit to a spend.
- 03
Design the system
Device selection, zoning, sounder coverage, cable routes and interfaces — issued as a drawing and a specification.
- 04
Price it properly
Itemised, including commissioning and certification. No provisional sums that inflate later.
On site
How the work is delivered
- 01
Programme and access
Agreed dates, isolation arrangements and any out-of-hours working.
- 02
First fix
Containment and cabling installed to the design, with routes kept clear of hazards.
- 03
Second fix and programming
Devices, panel, interfaces and cause-and-effect configured to the agreed strategy.
- 04
Commissioning
Every device tested, sound pressure levels verified, interfaces proven, and the system demonstrated to your staff.
- 05
Certification and handover
Design, installation and commissioning certificates, as-fitted drawings, zone plan and logbook.
Compliance
What the rules actually require
- BS 5839-1 categories are not interchangeable. An L3 system protects escape routes and rooms opening onto them; an L1 system covers all areas. Choosing a lower category to save cost has to be a deliberate, recorded decision — not an accident.
- The Regulatory Reform (Fire Safety) Order 2005 requires the premises to be equipped with appropriate fire detection and alarm arrangements. It does not name a category — that comes from the fire risk assessment.
- A system is only compliant once it has been commissioned and certificated. An installed but uncommissioned system is not evidence of anything.
- Where an existing system is taken over, we record its condition honestly at the point of takeover rather than inheriting someone else's paperwork.
Standards & legislation
These are not all the same kind of obligation, and we do not present them as if they were. A statutory duty is law. A British Standard is the recognised way of demonstrating you have met one. Guidance and our own recommendations are neither.
- British StandardBS 5839-1
Fire detection and fire alarm systems for buildings — non-domestic premises
Code of practice for system design, installation, commissioning and maintenance. Defines the L and P categories.
- British StandardBS 5839-6
Fire detection and fire alarm systems in domestic premises
Applies to dwellings, including HMOs and individual flats. Defines LD and grade classifications.
- Legal requirementRRO 2005
Regulatory Reform (Fire Safety) Order 2005
Requires appropriate fire detection and warning arrangements determined by the fire risk assessment.
Read the primary source →
Ongoing support
Planned, reactive and multi-site.
Most providers do one of these well. The value of a single provider is that the schedule, the emergency and the portfolio all sit in the same place.
Planned maintenance
- The new system enters a servicing calendar at handover
- Servicing to BS 5839-1 intervals from the commissioning date
- Battery and device lifecycle tracked against the asset register
Reactive support
- Fault attendance under the same contract as the installation
- False alarm investigation and cause analysis rather than repeated resets
Multi-site & national portfolios
- Consistent panel platform across a portfolio so your team learns one interface
- Networked head-end where sites share a campus
- One design standard applied estate-wide
Procurement, simplified
What happens next?
- 01
Tell us what you need
One form, one call or one email. A photograph or an existing report is enough to start.
- 02
We assess the requirement
We confirm scope, access, and whether a site survey is needed before anything is priced.
- 03
You receive a clear quotation
Itemised, with what is included and what is not. No provisional sums that move later.
- 04
We arrange attendance
A confirmed date and window, with the engineer or trade named in advance.
- 05
Works are completed
Carried out by directly managed engineers or vetted specialist subcontractors.
- 06
Evidence is supplied
Certification, test records and photographic evidence where the work calls for it.
Answers
Fire Alarm Installationsquestions.
What is the difference between L1, L2, L3 and L4 fire alarm systems?
Can you replace the panel and keep the existing detectors?
How long does a fire alarm installation take?
Related services
Other disciplines
Locations covered
- Aberdeen City
- Aberdeenshire
- Angus
- Antrim and Newtownabbey
- Ards and North Down
- Argyll and Bute
- Armagh City Banbridge and Craigavon
- Barnsley
- Bath and North East Somerset
- Bedford
- Blackburn with Darwen
- Blackpool
- Blaenau Gwent
- Borough of Bolton
- Borough of Bury
- Borough of Halton
- Borough of Oldham
- Borough of Rochdale
- Find coverage near you →
Get a quotation for fire alarm installations.
One form, one call or one email. A photograph or an existing report is enough for us to start — and we will tell you plainly whether a site survey is needed before anything is priced.
